Automotive

Daicel Safety Systems America

Manufacturer of auto air bag inflation devices

Plant Addition

Daicel Safety Systems America aimed to create a plant addition for steel inflator tubes they had previously purchased. Denham-Blythe delivered this design-build project determined to provide a safe and comfortable environment for its employees.

  • Constructed collector trench full facility length to collect process oils
  • Installed powerful HVAC & filter system to remove cleaning vapors
  • Erected 3-ton overhead crane spanning 125'
  • Built scrap dumpster room with sound attenuation wall panels

  • Contract Amount
  • $4,200,000
  • Location
  • Beaver Dam, Kentucky
  • Square Feet
  • 41,900
  • Duration
  • 8 Months
  • Project Type
  • Addition