Denham-Blythe oversaw the demo/renovation of a two-story reutilization from distillery bottling shipping/receiving area into visitor’s center while maintaining the structural integrity of the 1881 historical building.

  • Installed micro piles for new building columns and tank foundations.
  • Installed new 9’ section of building columns & wall girts on north and south sides for roof raise.
  • Installed 12 new fermentation tank foundations – 2’ thick reinforced concrete.
  • Placed new 6” floor slab with integral 130’ long stainless steel floor trench & grating.
  • Constructed 5 new offices, breakroom, restroom and electrical room on north mezzanine.
  • Installed 13,000 SF structural steel mezzanine framing, galvanized grating & egress stairs for fermentation tank access & tours.
  • Renovation of existing employee break, restrooms, lobby, offices & lab space.

  • Project Value
  • $1,828,260
  • Location
  • Frankfort, KY
  • Square Feet
  • 12,900
  • Project Type
  • Renovation