Industrial + EPC

Electrolux

Swedish multinational home appliance manufacturer

Press Building Expansion & Renovations

As need for Electrolux products has grown, the facility continues to look for means of creating the most efficient assembly model. Since Denham-Blythe has worked on nine projects with Electrolux (2013-2018) our feasibility study for an expansion to house three new presses for this project included our intimate knowledge of the existing facility and its needs.

  • Four new loading docks and concrete entrance ramp
  • Phased construction installation to keep an existing important shipping area operational while a new one was being constructed nearby
  • New construction directly adjacent to existing building required creative foundation systems
  • Low bay building 40' tall and high bay areas at 50' tall
  • Three 57'-span crane bays with 40-ton overhead cranes, each
  • 14' deep press pits and cullet tunnel along with removable tunnel designed to safely carry forklift loading

  • Contract Amount
  • $8,100,000
  • Location
  • Springfield, Tennessee
  • Square Feet
  • 60,000
  • Duration
  • 9 Months
  • Project Type
  • Expansion & Renovations

Worried your project will be over budget and not on time? Design/Build with DBC and worry no more.

Let's get started with a free project assessment