Daicel Safety Systems America
Manufacturer of auto air bag inflation devices
Plant Addition
Daicel Safety Systems America aimed to create a plant addition for steel inflator tubes they had previously purchased. Denham-Blythe delivered this design-build project determined to provide a safe and comfortable environment for its employees.
- Constructed collector trench full facility length to collect process oils
- Installed powerful HVAC & filter system to remove cleaning vapors
- Erected 3-ton overhead crane spanning 125'
- Built scrap dumpster room with sound attenuation wall panels
- Contract Amount
- $4,200,000
- Location
- Beaver Dam, Kentucky
- Square Feet
- 41,900
- Duration
- 8 Months
- Project Type
- Addition