Industrial + EPC
Electrolux
Swedish multinational home appliance manufacturer
Press Building Expansion & Renovations
As need for Electrolux products has grown, the facility continues to look for means of creating the most efficient assembly model. Since Denham-Blythe has worked on nine projects with Electrolux (2013-2018) our feasibility study for an expansion to house three new presses for this project included our intimate knowledge of the existing facility and its needs.
- Four new loading docks and concrete entrance ramp
- Phased construction installation to keep an existing important shipping area operational while a new one was being constructed nearby
- New construction directly adjacent to existing building required creative foundation systems
- Low bay building 40' tall and high bay areas at 50' tall
- Three 57'-span crane bays with 40-ton overhead cranes, each
- 14' deep press pits and cullet tunnel along with removable tunnel designed to safely carry forklift loading
- Contract Amount
- $8,100,000
- Location
- Springfield, Tennessee
- Square Feet
- 60,000
- Duration
- 9 Months
- Project Type
- Expansion & Renovations
Worried your project will be over budget and not on time? Design/Build with DBC and worry no more.
Let's get started with a free project assessment